Six free action plan templates in Microsoft Word and Excel. An action plan is the document that turns a goal into a short list of steps, each with one named owner and a date. Most action plans fail for the same two reasons, and both are visible on the page before any work starts: rows nobody owns, and rows that describe an intention rather than an action.
- Templates6 designs
- FormatWord and Excel
- Opens inOffice, Google, LibreOffice
- CostFree, no signup
Action plan, project plan, or to-do list?
These overlap enough that people reach for the wrong one, and the wrong one is either too heavy to maintain or too light to be useful.
| Document | Use it when |
|---|---|
| Action plan | You have one goal and need the handful of steps that reach it, each assigned and dated. No dependencies modelled, no durations. The right tool for most goals most of the time. |
| Project plan | Steps depend on each other, durations matter, and a slip in one place moves everything after it. If you need to know what the critical path is, you want a project plan, not this. |
| To-do or task list | Work that needs remembering rather than reaching a goal. No owner column because it is all you. A task list is the better fit, and lighter to keep up. |
| Business plan | You are describing a whole business to a lender or investor — market, model, financials. Different document entirely: see our business plan templates. |
The templates
Six layouts, some in Word for printing and circulating, some in Excel where you want status and dates to sort. Each download is a zip file — extract it before opening.
What every row needs
| Column | Why |
|---|---|
| Action | One step, starting with a concrete verb. See the verb test below. |
| Owner | One person. Not a team, not two names, not a job title with three holders. A row owned by two people is owned by nobody, and this is the single commonest fault in action plans. |
| Due date | A specific date, not a month or a quarter. “Q2” means the last week of Q2 to everybody, and then it means the week after. |
| Done means | What will exist when this is finished — a sent email, a signed contract, a published page. Without it, status is a matter of opinion. |
| Status | Three or four values at most. Not started, in progress, blocked, done. A percentage invites 90% for weeks. |
| Blocked by | Only where something genuinely cannot start until something else finishes. If most rows need this, you have a project, not an action plan. |
The one-owner rule has a respectable pedigree. When George T. Doran introduced the SMART acronym in Management Review in 1981, his A stood for “assignable” — name who will do the work. It has since drifted to “achievable” or “attainable” in most retellings, which is a reasonable thing to want from a goal but quietly removed the letter that mattered most for turning one into actions. For a plan with several contributors to a single step, keep one accountable owner and list the others separately; naming everyone in the owner column is how accountability disappears.
The verb test
This is the fastest way to improve an action plan, and it takes about five minutes. Read each row and ask whether you could tell, from the outside, that it had happened.
| Not an action | An action |
|---|---|
| Improve customer satisfaction | Send the post-purchase survey to all June customers |
| Review the supplier situation | Get written quotes from three alternative suppliers |
| Explore training options | Book the two-day course for the four warehouse staff |
| Better onboarding | Write the first-week checklist and give it to HR to approve |
| Look into the website | Fix the broken links on the top twenty pages |
The left column are goals, intentions and topics. They can all be true at the end of the month without anything having happened. The right column either happened or did not. Words like improve, review, explore, consider, monitor and look into are the warning signs — they describe an attitude towards the work rather than the work.
Keep the goal itself in the left-hand column of the plan, or in a line above it. You are not removing the goal, you are just refusing to let it sit in a row with an owner and a due date, where it will stay at “in progress” until the plan is abandoned.
Writing the plan
-
Write the goal so you could prove it
“Grow the business” cannot be proved. “Add 40 paying customers by 30 June” can. State the measure and the date, even if the number is a guess — a wrong number can be corrected, a vague one cannot be argued with. This is the S, M and T of SMART doing real work.
-
Write down where you are starting from
The current number, today. How many customers, what the current error rate is, how long the process takes now. Almost everyone skips this, and then has no way to tell at the end whether the plan worked or the market moved. It takes two minutes and it is the only reason the final review will mean anything.
-
Work backwards from the deadline
Start at the end date and step back through what has to be true before it. This surfaces the uncomfortable thing a forwards list hides: that the first step needed to begin three weeks ago. Better to find that out while the plan is still a draft.
-
Cut the list to what you can actually run
A plan with thirty actions is a wish list. If a step is large enough to need its own steps, either promote it to its own plan or reduce it to the next concrete thing you can do. Fewer rows that move beats many that do not.
-
Separate what you control from what you hope for
The goal is usually a lagging measure — revenue, satisfaction, retention — which nobody can do on a Tuesday. The actions should be leading: the calls made, the pages fixed, the quotes requested. If every row’s success depends on how other people respond, the plan has no steps in it, only bets.
-
Fix the review slot before you circulate it
Fifteen minutes, same time each week or fortnight, in the calendar, with the owners present. An action plan without a standing review is a document; with one it is a process. Put the date of the first review on the plan itself.
Why action plans die in week three
Almost always one of these four, and all four are avoidable:
- Nobody owns the plan itself. Separate from owning the rows. One person has to chase it, or the first missed date goes unremarked and the second one sets the norm.
- Status is updated by the author, not the owners. If one person collects everyone’s progress, they become a bottleneck and the plan becomes their problem. Owners update their own rows before the review, even if that means a shared sheet rather than a printed one.
- Too many actions open at once. Everything is in progress and nothing is finished. Limit how many rows are active rather than how many exist.
- Blocked rows sit silently. “Blocked” has to be a status that triggers a conversation, not a parking space. A row blocked for two reviews running needs re-scoping or removing — leaving it there teaches everyone that the plan tolerates being ignored.
At the end, do a short honest review against the starting numbers you wrote down in step two: what moved, what did not, and which actions turned out to be the ones that mattered. For individual goals rather than team ones, that review is the point where an action plan naturally becomes a personal development plan for the next period.
Common questions
Which should I download, the Word or the Excel version?
Excel if the plan will be updated repeatedly, because you can sort by owner or due date and filter to one person’s rows. Word if it is going to be printed, circulated, or attached to something formal like an audit response or a funding application.
Do I need Microsoft Office?
No. The Excel files open in Google Sheets or LibreOffice Calc, the Word ones in Google Docs. For a shared plan, Google Sheets has a real advantage: owners can update their own rows, which is the habit that keeps a plan alive.
How many actions should a plan have?
There is no correct number, but if you cannot read the whole plan in under a minute it is probably two plans. Five to twelve rows per goal is typical for something that gets completed. Thirty rows usually means the goal was never broken down, just listed.
What about RACI?
Worth adding only when several people contribute to the same step and it is genuinely unclear who decides. Responsible does the work, Accountable answers for it, Consulted is asked, Informed is told. The rule that matters is the same one as above: exactly one person accountable per row, however many letters you add.
I came here for a business plan outline. Where did it go?
It was on this page by mistake — an executive summary and a market analysis belong in a business plan, not an action plan. Our business plan templates cover that properly, section by section.
Can I use these commercially?
Yes, inside a business or for client work. You may not resell or redistribute the template files themselves. See our Terms of Use.